AI Green Calculator

How much can solarsave you?

Pop in your TNB bill and get an instant, AI-powered estimate of your rooftop solar savings — system size, payback, and whether you actually need a battery.

TNB RM0.443/kWh under 1500 kWhRM0.543/kWh above635W panels, min 7.62 kWpFree PDF report
RM
0RM2000+

When is your home mostly used?

What meter do you have?

Get your full report as a PDF

Enter your WhatsApp number to unlock the download. The PDF is generated instantly on your device.

By downloading, you agree to be contacted about solar solutions.

You could save

RM330.88

every month

Per year

RM3,971

Over 25 years

RM135,363

Recommended system

7.6 kWp

12 x 635W panels

Estimated cost

RM19,812

5 kW inverter

Payback period

5.0 yrs

4.2 yrs with the RM3,000 incentive

Self-consumption

70%

used directly, at full tariff

CO₂ avoided

5.9 t/yr

like planting 283 trees

Where your 846 kWh of solar goes

Used directly — saves the full TNB tariff593 kWh (70%)RM262.50
Exported to grid — offset at RM0.27/kWh253 kWh (30%)RM68.38

Your bill after solar

RM19.12

95% of your RM350.00 bill wiped out by direct savings plus export credits

AI remarks

Battery: not required — only about RM26/month of upside
RM3,000 TNB incentive may apply — not deducted from the cost above
Single phase meter: max 7.62 kWp / 5 kW inverter — you are at the limit

Assumptions

Based on the TNB domestic tariff of RM0.443/kWh for the first 1500 kWh and RM0.543/kWh above that. Solar energy consumed in the home while it is generated saves the full tariff, while surplus exported to the grid is offset at RM0.27/kWh below 1500 kWh a month and RM0.37/kWh above that. Systems start at 12 panels of 635W (7.62 kWp); a single phase meter allows up to 7.62 kWp (5 kW inverter) and a three phase meter up to 22.5 kWp ( 15 kW inverter). Bills under RM240 a month are generally too small for solar. Daytime consumption is assumed at 75% of monthly usage for your household profile. Solar yield of about 111 kWh per kWp each month, an installed cost of around RM2,600 per kWp for single phase, 0.5% annual panel degradation, 3% annual tariff escalation and a 25-year system life. Figures are estimates for guidance only — a site visit is needed for a firm quotation.